Designed and Built by Craig Walker
This is difficult in a traditional genral contractor/client relationship. We are more successful than others because we never touch our clients' production money, focusing instead on applying our construction and management skills on what we do best.
We don't build every project we design. Those we do build benefit from 45 years of building experince and the luxury of having your architect on the build with you.
Most remodeling and building contractors present themselves as full design-build firms, but many simply subcontract the design work to outside architects or interior designers, then add their markup on top of that cost.
At ZeroDown Consulting, design is part of the process from the beginning. We handle design planning in-house with our own architectural professionals.
That keeps the process more transparent, more efficient, and better aligned with how the project should actually be built.
A design is not just a pretty drawing. It should solve problems, improve flow, support the budget, and make the build easier to execute correctly.
Make the most of the square footage you already have before assuming you need more.
Rooms should connect naturally, comfortably, and logically for the way you live.
Design should reflect financial reality, not create disappointment after the drawings are done.
Good design respects structure, sequence, cost, and how the work must actually happen in the field.
The earlier design, scope, and cost are aligned, the less likely the project is to drift into confusion, compromise, or expensive course correction.
We start by clarifying what the homeowner wants the space to do better, not just what they want it to look like.
We shape the design around realistic construction methods, priorities, and budget considerations before the build starts.
When drawings, decisions, and expectations are aligned, the production phase becomes stronger, smoother, and more predictable.
These examples show the range of work we have planned, designed, and built, from original concepts to major renovations and additions.
Designed and Built by Craig Walker
An original design created by Craig Walker.
An original design created by Craig Walker.
Designed and Built by Craig Walker.
Architectural Design by Craig Walker
Designed and Built by Craig Walker
Designed and Built by Craig Walker.
TThe term Design/Build is thrown around like a catch phrase. Few builders actually employ it as it is intended. The roots of D/B come from days past when architects designed and managed the build throughout.
ZeroDown Consulting was created to ressurect the intention of the term with the added benefit of builder cost pricing: not to build cheaper, but to uncomplicate the relationship betwen builder and client.
WE offer design creation shaped by real construction knowledge.
You get clearer budget awareness before major commitments are made.
The result is a project that is built the way it was designed, not a compromise based on convenience or skill limitations.
Schedule a free design consultation and discuss what the project should look like before production begins.